Owner portal
- Stage
- Vertical construction
- Waiting on you
- 3 approvals
- Schedule
- 2 items flagged, finish date holding
- Current draw
- Draw 7, assembling
Awaiting your approval
Nothing goes out without your approval.
Change order
CO-014: Add blocking for future wall-mounted TVs in Type A units
Adds solid blocking behind the living room wall in 96 Type A units before drywall. Doing it now costs less than retrofitting after turnover. Pricing from the framing subcontractor is attached and checked against the unit count.
Reply to a subcontractor
Drafted reply to the drywall subcontractor on Level 4 sequencing
"Thank you for flagging the Level 4 hold. Mechanical inspection passed this morning, so Level 4 is released to you starting Monday. Please confirm crew size by Friday so we can schedule the hoist."
PO exception
Purchase order for appliance package exceeds budget line by 3.1%
Two alternate suppliers were priced. The current supplier remains the lowest complete bid and holds the delivery date. Recommendation: approve and draw the variance from the appliance contingency.
Today in the field
Sent by superintendents by text, filed automatically.
Superintendent, Building A
Level 4 walls framed on the north wing. Electrical rough-in started on Level 2. Dumpster swapped.
Framing 14Electrical 6

Superintendent, Building B
Drywall hung on Level 1 east. Plumbing top-out passed inspection on Level 2.
Drywall 11Plumbing 4

Assistant superintendent
Fire lane base course compacted and tested. Results attached.
Sitework 5

Superintendent, Building A
Roof membrane complete over the stair towers. Rain expected Thursday; open areas will be covered.
Roofing 7

Schedule
Progress by phase. Plain-language notes on anything that moved.
- Sitework100%
- Foundations100%
- Podium100%
- Framing72%
- Mechanical, electrical, plumbing41%
- Exterior18%
- Interiors4%
Window delivery for Building B moved by two weeks.
Close-in of Building B shifts by about six working days. The framing crew moves to Building A in the meantime, so the overall finish date holds.
City rescheduled the Level 3 electrical inspection.
One working day lost. A Saturday shift recovers it. No decision is needed from you.
Permits and inspections
Every permit in one place, with what's next.
| Item | Agency | Latest | Status |
|---|---|---|---|
| Building permit, Building A | City | Issued Sep 12 | Issued |
| Fire sprinkler deferred submittal | Fire department | Resubmitted Oct 22 | In review |
| Level 3 electrical inspection | City | Moved to Nov 3 | Scheduled |
| Fire lane encroachment permit | Public works | Expires Dec 15 | Issued |
Decisions on file
Every answer, who gave it, and when. "Why did we do it this way" always has an answer.
- Question
- Drawings show the valve at two heights in the accessible unit bathrooms. Which governs?
- Answer
- Use the height on the accessibility sheets. The plumbing sheets will be revised in the next bulletin.
- Decided by
- Architect of record
- Date
- Oct 21
- Question
- The specified paver has a long lead time. May the approved equal be used in the courtyards?
- Answer
- Yes. The approved equal matches color and slip rating. A sample was reviewed and accepted on site.
- Decided by
- Owner representative and landscape architect
- Date
- Oct 14
- Question
- A beam conflicts with the exhaust fan location at gridline D. Can the fan shift two feet east?
- Answer
- Shift approved. The mechanical engineer confirmed airflow is unaffected.
- Decided by
- Mechanical engineer
- Date
- Oct 7
Bids
Incoming packages, logged as they arrive.
| Package | Due | Addenda logged | Bids in | Status |
|---|---|---|---|---|
| Interior paint | Nov 4 | A, B | 3 of 5 | Open |
| Cabinets and countertops | Nov 11 | A | 2 of 4 | Open |
| Landscape and irrigation | Oct 28 | A, B, C | 4 of 4 | Leveling |
| Elevators | Oct 2 | None | 3 of 3 | Awarded |
Draws
The current draw package, checked before it reaches you.
Draw 7, October
Assembling 2 lien waivers outstanding
- Subcontractor invoices42 of 42complete
- Conditional lien waivers40 of 42pending
- Inspection reportReceived Oct 24complete
- Updated schedule of valuesCompletecomplete
This page is a concept with sample data. It shows how an owner could follow a Kantarra West project day to day. It is not a live system.